Tappan Zee Bridge repair schedule
-
- March
- 30
Here is this week’s repair schedule on the Tappan Zee Bridge:
• Monday: Right lane Westchester-bound closed for bridge maintenance from milepost 16.1 to 13.1 between 9:30 a.m. and 2:45 p.m.
• Tuesday: Right lane Westchester-bound closed for bridge maintenance from milepost 16.1 to 13.1 between 9:30 a.m. and 2:45 p.m.
• Wednesday: Right lane Westchester-bound closed for bridge maintenance from milepost 16.1 to 13.1 between 9:30 a.m. and 2:45 p.m.
• Thursday: Right lane Westchester-bound closed for bridge maintenance from milepost 16.1 to 13.1 between 9:30 a.m. and 2:45 p.m.
• Friday: Right lane Westchester-bound closed for bridge maintenance from milepost 16.1 to 13.1 between 9:30 a.m. and 1 p.m.
And here’s the deck replacement schedule:
• Monday: Work begins at 8 p.m. resulting in the closure of two right Rockland-bound lanes, with an additional right Rockland-bound lane closing at 9 p.m. until 6 a.m. Tuesday from milepost 13 to the west abutment on the bridge. Two left Westchester-bound lanes from Exit 10 in Nyack to the west abutment will also be closed from 8 p.m. to 6 a.m.
• Tuesday: Work begins at 8 p.m. resulting in the closure of two right Rockland-bound lanes, with an additional right Rockland-bound lane closing at 9 p.m. until 6 a.m. Wednesday from milepost 13 to the west abutment on the bridge. Two left Westchester-bound lanes from Exit 10 in Nyack to the west abutment will also be closed from 8 p.m. to 6 a.m.
• Wednesday: Work begins at 8 p.m. resulting in the closure of two right Rockland-bound lanes, with an additional right Rockland-bound lane closing at 9 p.m. until 6 a.m. Thursday from milepost 13 to the west abutment on the bridge. Two left Westchester-bound lanes from Exit 10 in Nyack to the west abutment will also be closed from 8 p.m. to 6 a.m.
• Thursday: Work begins at 10 p.m. resulting in the closure of three right Rockland-bound lanes until 6 a.m. Friday from milepost 13 to the west abutment on the bridge. Two left Westchester-bound lanes from Exit 10 in Nyack to the west abutment will also be closed from 8 p.m. to 6 a.m.
• Friday: Work will begin at 10 p.m. resulting in the closure of two right Rockland-bound lanes, with an additional Rockland-bound lane closing at midnight, until 6 a.m. Saturday from milepost 13 to the west abutment on the bridge. Two left Westchester-bound lanes from Exit 10 in Nyack to the west abutment will also be closed from 9 p.m. to 8 a.m.
All lane closures are subject to change due to traffic, weather or emergency situations. The public is also notified on Tappan Zee Bridge repairs and lane closures via dynamic message signs and Highway Advisory Radio, 530 AM.












